Intersection improvements in New Bedford (Massachusetts, US)
Drainage at Acuhsnet Av.
Project duration: 18 months
BID Amount: $2 million
The work under this contract consists of:
- pavement milling and overlay with box-widening along Acushnet Avenue from south of Cherokee Street to Tobey Street (Station 11+00 to 18+55)
- removing and stacking or resetting of existing granite curb
- installation of new granite curb
- construction of sidewalks
- hydrant removal and installation
- waterline removal and installation
- installation of new catch basins, manholes, tree filter boxes and drainage trunk line
- construction of driveway aprons
- loaming and seeding
- installation of signs and pavement markings
- installation of a traffic control signal system with video detection, signal posts, signal heads, mast arm assemblies, cabinet, foundation, wire and cable, pull boxes, and electrical service connection.